Safe Crane Operations
Answer Safe crane operations include:Read and understand the operators manualFollow all placards, warning labels and signs on machineKnow the SWL of the crane and never exceed itDetermine the weight of the load from accurate sourcesIf an estimate…
Safe crane operations include:
- Read and understand the operators manual
- Follow all placards, warning labels and signs on machine
- Know the SWL of the crane and never exceed it
- Determine the weight of the load from accurate sources
- If an estimate of the load is near the max. capacity of the crane, then use a dynamometer to measure the exact weight
- Use a loud signal, such as a whistle, horn or bell or verbal warning to alert employees of crane movement
- Never hoist a load over the heads of employees
- Never use limit switches or end stops as operating controls
- Begin each shift by testing the upper limit switches
- Avoid running the crane into the end stops or limit switches
- Never walk backward when guiding a load
- Never hoist two or more separately the capacity of the crane even if the combined weight is with in the capacity of the crane
- Never wrap the hoist line around the load
- Never electrical load and/or hoist-limit switches or warning devices
- Start lifts slowly and avoid shock loading
- Always place the hook directly over the center of gravity or the designated lifting point
- Use taglines to help maneuver the load
- Never use taglines to swing the load
- Before hoisting the load, check for loose parts that might shift or fall
- On cranes with wire rope hoist lines, there should never be less than two wraps on lagged (grooved) drums and three wraps on unlagged
- When lifting near or at capacity, test the brakes after the load is raised a few inches
- Suspend and transport loads at a level that allows the operator a clear view
- Never drag slings, cables or chains across the floor