Knowledge base · General engineering
UB Equipment introduces 4 new models
Photo: Construction Machinery on Site - geograph.org.uk - 196825 by Kokai · CC BY-SA 2.0 via Wikimedia Commons
UB Equipment introduces 4 new models. UB-303H (stands for high flow capability), will be able to take higher oil flow than normal. UB-303 (750 ft.lbs class) UB-316 (8000 ft.bls), 319 (11,000 ft.lbs) upgraded from the old 315 (7500 ft.lbs) and 318(10000 ft.lbs). UB-321 is the biggest size in our line up rated @ 13,500 fl.lbs with chisel diameter of 7.3″
Technical context from YJMT
Matching a hydraulic breaker to its carrier
The text above is an archived manufacturer announcement. The notes below are ours: general guidance on this class of equipment, with no specification attributed to any named product.
Three numbers have to agree
A hydraulic breaker is not selected by impact energy alone. Three things must match the carrier before anything else:
- Carrier weight range. Every breaker is rated for a band of machine weights. Too large a breaker on a light excavator overloads the boom and destabilises the machine; too small a breaker on a heavy one simply will not break the material and wears itself out trying.
- Oil flow. The breaker's required flow must fall within what the carrier's auxiliary circuit delivers. Too little flow reduces blow rate; too much overheats the system and can damage the breaker.
- Operating pressure. Set with a relief valve on the auxiliary circuit, not assumed. Running above the breaker's rated pressure shortens seal and piston life quickly.
Energy class and blow rate
Impact energy per blow, often quoted in foot-pounds or joules, sets what the tool can fracture. Blow rate sets how quickly it works through material once fractured. Hard, massive rock rewards high energy per blow; softer or already-fractured material rewards a higher blow rate. A breaker specified purely on energy class will disappoint on the wrong material.
Tool choice and technique
Moil points concentrate energy for hard rock; chisels suit layered material and follow a line; blunt tools suit concrete demolition. Whatever the tool, the operator must keep it perpendicular and under load, and must not blank-fire into air or lever with the tool — both destroy the lower bushing far faster than the material ever will.
Sourcing desk
Need the machine, not just the theory?
Send the specification and destination port. You get a factory-direct price, lead time and shipping estimate within two business days.