Cranes and heavy equipment maintenance in construction industry
The construction industry is classified as one of the largest industries in the nation. The construction chartbook reports that 3.8% of the gross national product is generated by the construction industry. The reported spending in the industry reached $452.1 billion during 1996. However, because of its’ extreme competitiveness, this business is consistently fraught with failures. Construction businesses fail at the rate of 1.4 times the national average and 37% of these failures had been in business 10-yrs or more (CPWR, 1998).
The high failure rate and extreme competitiveness of the construction business demands that contractors continuously look for new ways to reduce costs. Many companies seek to gain competitive advantages by reducing labor and raw material costs or by increasing service and controlling losses. One way that companies in the industrial sector have found effective in increasing profit margins is by effective equipment maintenance. DuPont, for example, reported cost savings of $200 million a year from improved maintenance practices (Fredendall, 1997). Return on investment (ROI) rates of 500% has been documented through effective maintenance policies (Hartmann, 1992). This can be a real competitive advantage in controlling the losses associated with production downtime and emergency equipment repairs, with an added bonus of improved safety performance (Hartmann, 1992). Yet, extensive research cannot find these proactive maintenance techniques currently being utilized in the construction industry.
Most construction companies tend to concentrate maintenance efforts on unscheduled breakdowns or emergency repairs. These tend to be the most costly in production losses, maintenance department overtime and in expediting parts for repairs. Typically, a construction company’s largest assets are in the equipment it owns. By anticipating and preventing these unplanned events a company can protect its’ equipment assets from production downtime, unscheduled loss or expensive failures, while improving safety factors.
The continual effort to improve safety performance in the face of this extreme competition has created the need for XYZ Construction to consider new methods to further augment their risk management program. There is a strong management suspicion that ineffective field maintenance of their equipment is creating failures in their cranes and heavy equipment. This is generating significant safety issues. This suspicion has been created by three serious accidents and equipment losses occurring in less than three months.
These occurrences are summarized as follows:
1. June, Man-lift Failure, an all terrain man-lift failed during a wooden concrete form fire. Two employees were assembling wooden concrete forms at approximately 25-ft above the ground in the ABC man-lift. Another employee on the ground was preparing steel rebar on the ground with a torch when the forms caught on fire. In the ensuing fire, the man-lift failed, and both were burnt while stuck in the basket over the fire. One was burned on over 80% of his body. This piece of equipment had a history of maintenance problems relating to controls failure.
2. July, Crane failure, while hoisting a 1.5-yd concrete bucket the boom brake (which holds the boom erect) on an 85-ton crane failed, destroying a section of concrete formwork and narrowly missing several employees. The machine was repaired, and the very same thing occurred the next day when the machine was operated. The maintenance mechanic called to repair the machine had performed improper maintenance and fixed the wrong brake.
3. August, Crane failure, a 150-ton crane was being assembled to work in a new location. After assembly, oil was discovered leaking from the machine. Inspection revealed the machine had been improperly maintained and operated without oil for several months. Complete disassembly is required for repairs; costs are expected to exceed $80,000 and result in two or three week’s downtime.
This type of failure can be unacceptable with cranes and heavy equipment. It has potential to endanger workers and to create tremendous damages. These issues, along with the constant need to improve safety performance, provide sufficient reason to evaluate and apply effective equipment maintenance plans into this corporate structure.