Sourcing desk · South Jinqiao Area, Pudong, Shanghai sale@machinerychina.org +86 21 6044 5623

Knowledge base · Cranes & lifting

Customer Order cranes should know a few basic parameters

274 words About 1 min read Published by YJMT
Cranes
Answer 1, electric single-girder crane 2, electric single-girder overhead crane 3, the electric double girder crane 4, the technical parameters Type: Starting weight: () kg; Lifting Height: () m; Span: () m Cart travel distance: () m…

1, electric single-girder crane

2, electric single-girder overhead crane

3, the electric double girder crane

4, the technical parameters

Type:

Starting weight: () kg; Lifting Height: () m; Span: () m Cart travel distance: () m; specifications: (); Number: () Taiwan Supporting electric hoist Model: Lifting speed: single speed () m / min; double speed () m / min Car speed: single speed () m / min; double speed () m / min Cart speed: single speed () m / min; double speed () m / min Operation control: () cab operation; () cable ground operations; () wireless remote control Cart speed control mode: () linkage Taiwan; () cam speed; () Cab Type: () open; () closed Cab door Location: Right side of the door (); left open (); after the right door (); left open the door after the () Machine Color: () Electrical control voltage: three-phase AC () 36V; () 48V; () 24V Power requirements: three-phase AC, 380V, 50HZ Power Source by: () soft cable; () security slip line; () hard bare wire; () Electrical protection class: () IP44; () IP54. Electrical insulation class: () E-class; () F class. Electrical control action: () Total open, total stop; () fast rise; () quick drop; () slow rise; () slow down; () Car left the line; () car right line; () Cart forward; () carts back; () Equipment, use of the environment: less 85% relative humidity, ambient temperature -25? ~ 40?. Equipment working level: () Intermediate, JC25%; () weight class, JC40% Use rail type: Normal hot-rolled I-beam () No; () light rail; () heavy rail; (). Minimum bend radius of circular orbit: () m.

Sourcing desk

Need the machine, not just the theory?

Send the specification and destination port. You get a factory-direct price, lead time and shipping estimate within two business days.