Knowledge base · Grinding & milling
Grinding Ball Mill
Answer Open Ball Millgrinding circuit to a given surface area requires no more power than closedBall Millgrinding circuitto the same surface area provided there is no objection to the natural topsize.
Open Ball Millgrinding circuit to a given surface area requires no more power than closedBall Millgrinding circuitto the same surface area provided there is no objection to the natural topsize. if topsize must be limited in open circuit, power requirements rise drastically as allowable topsize is reduced and particle size distribution tends toward the finer sizes.
The work index, WI, should be obtained from test results or plant data, where the feed and product size distributions are as close as possible to those under sturdy.
The work index, WI, will vary considerably for materials that appear to be very similar. the work index will also have a considerable variation across one ore body or deposit.
The most reliable work index values are those obtained from long term operating data. if this is not available, standard grindability tests can be run to provide approximate values.
Rod and ball mill grindability test results should only be applied to their respective methods of grinding.
Rexnord has facilities for performing grindability tests which calculates the work index (Wi) for materials. for more details on the Grindability test and the Rexnord Research Facilities refer to Chapter 18.
If P is less than 80% passing 70 microns, power consumption will be W ((P+10.3)¦1.145P)
Example 1
A wet grinding ball mill in closed circuit is to be fed 100 TPH of a material with a work index of 15 and a size distribution of 80% passing ¼ inch (6350 microns). the required product size distribution is to be 80% passing 100 mesh (149 microns). in order to determine the power requirement, the steps are as follows:
W = 10 WI - 10 WI = 150 - 150 = 10.4 Kwh/T
?P?F?149?6350
HP – HR/T = 10.4 Kwh/T x 1.34 HP – HR/Kwh = 13.9 HP – HR/T
HP = 100 T/HR x 13.9 HR – HR/T = 1390 HP or a 1400 HP mill is required.